How a Roaster Factory Freezes Destination Voltage Into the Build

Created on 11.24

How a Roaster Factory Freezes Destination Voltage Into the Build

Our recommendation is to state the destination voltage and plug requirement twice — in the enquiry and on the order — and then ask how the factory carries that requirement onto the work instruction and the nameplate. Foshan Akimita Shunde 1st Branch publishes that machines are configured for both 110 V and 220 V grids so customers in different regions receive units matched to local standards, and its 500 g platform manual describes a 1000 W heating element with 110–120 V and 220–240 V configurations. A configuration statement is easy to publish. The engineering question is whether the variant is controlled as a version, or inferred at packing. This article is the check we suggest.
Akimita Skywalker coffee roasters in 500g and 200g models on a kitchen counter.

Key Facts at a Glance

Where the variant appears
What it proves
What to request
Enquiry and order
The buyer stated the destination requirement
Both documents naming voltage and plug
Current specification sheet
The design defines that variant
The revision for your exact model code
Written assembly instruction
The station builds that variant
Confirmation that the instruction names the variant
Nameplate on the demonstration unit
The physical machine matches
A photograph or live view before dispatch
Unit-level performance inspection record
The individual machine was checked on that variant
The record requested with the unit

Why Voltage Is an Engineering Variable, Not a Shipping Detail

On a fully electric drum roaster, the heating element is the entire heat source. Direct Fire Imitating, the patented design behind the range, transfers heat through convection and radiant elements inside a fully electric drum, reproducing the thermal behaviour of a classic direct-fire roaster without a gas line, combustion exhaust or open flame. Heater behaviour at preheat is therefore one of the first things a development roast establishes. A variant is not just a plug moulded onto a cord: it changes which element and which controller configuration belong in the machine, and which electrical safety and earthing check applies at the station.
The published assembly-stage checks include electrical safety and correct earthing on the specified voltage variant, plus heating element response and controller behaviour at preheat. Those checks only mean something if "the specified voltage variant" is written down somewhere before the unit is built. Ask to see where.

The Chain a Buyer Should Verify

Step one: the enquiry. State the model code, tier, controller, destination country, voltage and plug type together. For example: ACR002B-050, 500 g Dual System Delta, 220–240 V. Adding the plug requirement here prevents the common end-of-order scramble where a correct voltage unit arrives with the wrong cord set.
Step two: the specification sheet. Request the current specification sheet for that exact code, with its revision, and confirm the electrical rating on it. The four codes are not interchangeable: ACR002A-050 Alpha, ACR002B-050 Delta, A11102 Cubean and A11102-P Cubean Pro differ in platform and controller. Cubean+ is an alternate name for the A11102-P machine, not a second model, and Cubean Pro is the primary name in our English documentation. A specification sheet assembled for a different variant does not describe your shipment.
Step three: the work instruction. The factory publishes that assembly follows strict written procedures and that parts are inspected before production begins. Ask whether the written instruction at the station names the voltage variant. A dated, code-specific instruction with the variant printed on it is evidence of document control; a generic instruction leaves the assembler to infer it.
Step four: the nameplate. Match the nameplate on the demonstration unit to the quotation, the specification sheet and the setup files. This is the same five-step nameplate check we recommend for all version-controlled documents, and it costs one photograph or one minute on a video call.
Step five: the records. Type-test documentation applies to a production-representative sample submitted for testing, with one sample unit submitted for that test. It covers the design and hardware version represented by that sample, not an individual machine — ask for the model code and hardware version it names and check that they cover your variant. The unit-level performance inspection record belongs to the individual machine, since machine performance is inspected on every unit before packaging. Request it with the unit.

What the Factory Visit Should Confirm

If you are visiting the Shunde site, use the assembly stop of the itinerary for this question. Factory visits and live roasting demonstrations are openly welcomed, so ask to see the nameplate and the work instruction on a unit in progress, then watch a demonstration roast on a machine configured for your voltage. Ask the operator to explain the preheat behaviour using the specification sheet you were handed at the start of the visit. A supplier with functioning version control completes that loop without changing documents mid-conversation.
If you cannot travel, request the document pack first, then a live video walkthrough that holds the camera on the nameplate, the written instruction at the station and the full roast cycle. Do not accept a general view of the production floor as evidence of a variant.

Installation Is the Other Half of the Question

Electrical configuration and ventilation are different problems, and a factory endorsement should not blur them. We do not claim that any machine produces no smoke; airflow, clearance and ventilation depend on the room. The Alpha platform has a built-in purifier and an independent chaff collector, with a chimney pipe route offered where ducting is possible. Confirm the filter arrangement on the current specification sheet for your model code before planning the counter, and read the user manual's safety notices and clearance requirements before installation.
We also do not publish a blanket conformity statement or a per-unit conformity document. Market requirements change, and a document issued for a previous configuration is not evidence for the machine on your invoice. Ask for current copies of the type-test documentation and confirm that the model family and hardware version named in them cover the version on your quotation.

What We Deliberately Do Not Claim

We do not publish a rated hourly throughput, a guaranteed lead time, a price-match promise, a warranty term or a fixed delivery schedule. The 2,500 m2 floor and more than 30 skilled workers are facility descriptions published by the factory, not a capacity rating. We do not repeat shorter roast cycles, wider capacity ranges or heritage figures that appear on regional pages or distributor listings but are not in the factory specification. Where the 500 g platform publishes a 15–20 minute roast cycle, that is a cycle for that platform, not a throughput promise for every code.

Frequently Asked Questions

Can one specification sheet cover both voltage variants?It can describe both, but the unit you order is one variant. State the destination voltage and plug in the enquiry and on the order, and ask that the written instruction and nameplate identify that variant.
Does type-test documentation prove my specific unit was checked?No. It applies to a production-representative sample submitted for testing, with one sample unit submitted for that test. Your machine is covered by its own unit-level performance inspection record.
Should I ask for a different spare-parts list by voltage?Yes. Heating elements and control boards are version-sensitive. Request the stocked parts list for your full model code and hardware version, not a generic catalogue.
Is 300 g the normal batch on the A11102-P?No. 300 g is the stated maximum and 200 g is recommended for automatic operation. Plan production around the recommended figure and confirm it on the current specification sheet.

Specification Note

The current specification sheet for the exact model code, with its revision, governs electrical rating, plug and cord configuration, heating element specification, sensor configuration, capacity, cycle time and filter arrangement. Where a product page, a distributor listing, a regional page or another version's manual differs, the specification sheet for the code on the nameplate governs.

Suggested Internal Links

  • Coffee roaster model codes and specification version control
  • Written assembly instructions and unit traceability in roaster production
  • A coffee roaster factory visit: the 90-minute buyer checklist
  • Coffee roaster incoming parts inspection and BOM change control
  • Coffee roaster factory verification records: what each one covers
Contact
Leave your information and we will contact you.

Coffee Roaster

500g Model Alpha

500g Model Delta

200g Model Cubean

Setup Download

Setup Download

Customer Service

电话