Our recommendation to any buyer comparing roaster suppliers is to ignore the phrase "we have R&D" until it is converted into documents. A development function is not a room with prototypes on a bench; it is a repeatable process that produces a controlled specification, a defined hardware version, setup files and a traceable change record. Akimita's Product Innovation Center page states plainly: "We own R&D center for coffee roaster development, coffee store for testing application scenarios, and factory for production." This article explains what that sentence should yield in practice, and which four items we suggest requesting before an order is confirmed.
Black metal machine with a top vent, front adjustment knob, and separate digital control panel.

Key Facts at a Glance

Claim on the published page
Document it should lead to
Why it matters to a buyer
R&D center for roaster development
Current specification sheet with a revision identifier
Dimensions, weight, power and filter arrangement are version-specific
Defined model codes
Nameplate code matched to the document set
Alpha and Delta are versions of one platform; A11102-P is one machine
Testing of application scenarios
Setup files and operator guidance for the demonstration roast
Confirms the profile guidance matches the controller you ordered
Factory for production
Unit-level performance inspection record
Separates production verification from type-test documentation

Start With the Sentence, Not the Adjective

A supplier can describe itself as innovative without ever defining what changed between one production batch and the next. A development center earns its keep when a buyer can ask a precise question — which controller does this unit carry, which specification revision applies, which setup file belongs to it — and get one consistent answer from sales, engineering and the assembly floor. That consistency is the real output of co-located research and production.
Our own published development timeline gives this process a history. Between 2015 and 2017 the founders studied coffee tools and coffee culture internationally; in 2018–2019 the Akimita brand was established with a diamond-pattern kettle and dripper line; in 2020–2021 the company became independent from its parent company Richy and set up its own company and cafe; from 2022 to 2024 it developed the electric coffee roaster and built its own factory. The point is not the number of years. It is that the organisation moved from manual brewing equipment into an electrically heated, sensor-controlled product, which requires a different discipline for documents and versions than a catalogue of kettles.

The Four Outputs We Suggest Requesting

1. A specification sheet that names a version

Ask for the current specification sheet for the exact model code, and ask which revision it is. On the 500 g platform, ACR002A-050 (Alpha) and ACR002B-050 (Delta) share a platform but carry different control interfaces. The Delta manual gives a 492 x 264 x 402 mm footprint and a 10 kg weight; those figures belong to that version and must not be used to plan an Alpha bench. A specification sheet that does not identify the code and revision cannot be used to plan an installation, a socket, a clearance or a ventilation route.

2. A nameplate-to-document match

Ask to see the nameplate on the demonstration unit and compare it with the quotation, the specification sheet and the setup files. This sounds trivially administrative, and it is the fastest way to detect a supplier that resells several hardware versions under one generic description. The 200 g platform has the same discipline: A11102 is the standard Cubean, and A11102-P is the dual-system Cubean Pro. A document set that lists one machine under several names or as separate SKUs is worth questioning.

3. Setup files and operator guidance bound to the controller

The engineering behind the range is visible in a short list of concrete choices: patented Direct Fire Imitating heat transfer, dual BT/ET temperature sensing, two control interfaces on the 500 g platform, three capacity tiers, version-controlled model codes, and integrated smoke and chaff handling. But a feature list is not an operating procedure. Ask which setup files and profile guidance apply to the controller on your unit. Artisan data logging is available on the Delta and Cubean Pro dual-system versions; the Alpha does not support it, and modifying an Alpha to add it voids the manufacturer's warranty. Artisan is third-party open-source software and is not licensed with the machine. A development center should be able to say which guidance belongs to which controller without ambiguity.

4. A clear boundary between development records and conformity records

Two different evidence chains are often collapsed into one sentence, and that is where factory descriptions become unreliable. Development testing explores thermal behaviour and repeatability on prototypes and pre-production units. Type-test documentation, by contrast, applies to a production-representative sample submitted for testing; one sample unit was submitted for that test. Separately, machine performance is inspected on every unit before packaging. Ask the supplier to describe each record and what object it covers. If the answer is a blanket assurance about documents held for every unit, request the underlying documents and the model codes they name instead.

What We Do Not Publish as R&D Output

We do not present a patent count as a performance figure. The figure of more than 20 patents is a company-published number; buyers assembling a tender should request the patent list and check which designs it covers. We do not claim a rated hourly output, a guaranteed lead time, a warranty duration, a price-match promise or a customer case study in a factory capability page. We do not claim that the machines produce no smoke; ventilation depends on the installation. And we do not carry unconfirmed figures from third-party listings or from other-language pages into an English specification — a shorter roast cycle, a wider capacity range or a long-heritage figure may appear in a distributor or regional page, but it is not a factory document.

Why This Matters More for Small-Batch Roasters

On a 200 g or 500 g machine, the operator is part of the control loop. A profile that works on Tuesday morning may not work on a humid afternoon with a new lot of green coffee and a different operator. The engineering response to that problem is measurement and documentation: BT/ET sensors, a visible curve where the hardware supports it, a defined 15–20 minute roast cycle on the 500 g platform, a dedicated cooling cycle, and setup guidance that a new operator can follow. Documents are what make that repeatable across staff turnover, which is exactly the situation a small café or a micro-roastery faces.
Our recommendation: treat the R&D claim as a request list, not a credential. Ask for the four outputs above, matched to one model code. A supplier with a functioning development process can produce them in one reply; a supplier without one will send a brochure.

Frequently Asked Questions

Does "we own an R&D center" mean every part is made in-house?No. It means coffee roaster development is carried out by our own team. Shunde's component ecosystem supplies drums, heating elements, control boards, motors, fans and sensors, with part inspection before production. Ask about the parts relevant to your service plan rather than assuming full vertical integration.
Which patent covers Direct Fire Imitating?Direct Fire Imitating is described on the official product pages as a patented heat-transfer design. For a tender or a compliance file, request the patent list from the factory and match each entry to the model and the claim you intend to cite. Do not quote a patent number from a marketing page.
Can I request a custom setup file or a modified controller?OEM and ODM discussions are handled through the Richy group's manufacturing base. Any agreed change should be recorded against a model code and a specification revision before production, so the shipped units and their documents remain aligned.
Is a 300 g batch available on the 200 g platform?The A11102-P has a stated maximum of 300 g, with 200 g recommended for automatic operation. Treat 300 g as a ceiling, not a working batch size. Plan production volume around the recommended figure and confirm it on the current specification sheet.

Specification Note

The current specification sheet for the exact model code governs all dimensions, weights, electrical configurations, filter arrangements and cycle times. The Product Innovation Center page is a facility description, not a specification document. Where a published page and a specification sheet differ, the specification sheet for that code governs.

Suggested Internal Links

  • Why we recommend a coffee roaster manufacturer with in-house R&D
  • What a coffee roaster testing lab should measure
  • Coffee roaster model codes and specification version control
  • Direct Fire Imitating and the patent portfolio behind the range
  • Akimita development timeline: 2015 to 2024
Contact
Leave your information and we will contact you.

Coffee Roaster

500g Model Alpha

500g Model Delta

200g Model Cubean

Setup Download

Setup Download

Customer Service

电话