A useful supplier audit does not ask "do you have certificates?" It asks what each document actually covers. Foshan Akimita Shunde 1st Branch applies three separate verification layers, and a buyer should request all three against the same model code and voltage variant: type-test documentation for the model design, a unit-level performance inspection record for the individual machine, and a demonstration roast showing the machine in operation. Conflating them is the most common documentation mistake in a roaster purchase, because a design-level report and a per-unit inspection record are evidence about two different objects.
Akimita Skywalker coffee roasters in 500g and 200g sizes with digital controls.

Key Facts

Record
Object it covers
How it is produced
What to check on the copy
Type-test documentation
The model design
Production-representative sample, one unit submitted for testing
Model code, hardware version, voltage variant, issuing body, validity
Unit-level performance inspection
Each individual machine
100% unit-level performance inspection before dispatch
Batch and unit identification on the order line
Demonstration roast
The machine in operation
Factory or Shunde showroom, optionally with the buyer's own green coffee
That the demonstrated configuration matches the order
CE, CB, LFGB, FDA and RoHS test reports are referenced as part of the type-test documentation for the model. We describe these as test reports produced from testing of a production-representative sample, not as unit-by-unit certification, and we do not match a report to a specific serial number on an individual machine.

Record 1: Type-Test Documentation for the Model

Type-test documentation answers a design question: does this model configuration meet the requirements it was tested against? It is produced on a production-representative sample, with one unit submitted for testing. That is a normal and efficient way to validate a design, and it is why the report describes a model and a hardware version rather than every machine that later leaves the line.
For an importer or a distributor, the practical check is field matching. Confirm that the model code, hardware version and voltage variant on the document copies match the configuration on the purchase order, and check the issuing body and validity period. Both 110 V and 220 V configurations exist across the range, and a documentation set assembled for a different variant is not the set that describes the shipment. Where a field is unclear, request the current specification sheet for the exact code ordered rather than filling the gap with an assumption.

Record 2: Unit-Level Performance Inspection

The second layer covers the individual machine. Every machine receives a 100% unit-level performance inspection before dispatch, and the inspection record can be requested for the batch in the same order line. This is the record that follows the unit a buyer actually receives, and it is separate from the design-level report.
Ask for it explicitly. It is easy for a documentation pack to contain only design-level reports and for a buyer to assume the individual machine was covered by them. The distinction matters at goods receipt and during a distributor audit, when the question is no longer "was this design tested?" but "was this machine inspected?"

Record 3: Demonstration Roast

The third layer is the machine in operation. A demonstration roast can be arranged at the factory or the Shunde showroom, including with the buyer's own green coffee, before dispatch. The showroom displays the 200 g, 300 g and 500 g machines side by side, so the four core models — the Standard Alpha, the Dual System Delta, the Standard Cubean and the Cubean+ / Cubean Pro — can be compared in one visit, and the manufacturing process can be viewed on the same trip.
A demonstration is not a laboratory report and should not be recorded as one. Its value is that it lets a buyer see heating behaviour, smoke and chaff handling, cooling and the control interface on the exact configuration being ordered, with their own beans. It is the point at which a specification sheet becomes an observable machine.

What Pre-Dispatch Verification Does Not Include in Our Description

We state the negatives as plainly as the positives. Pre-dispatch verification includes an ageing process; we do not state that every unit undergoes a 24-hour burn-in test. We do not describe the documentation as certification of each individual machine, do not claim a serial-number match between a type-test report and a shipped unit, and do not present Artisan as software licensed or supplied with the machine — it is open-source third-party software, and the factory supplies a controller configured to work with it on the dual-system models.
Nor do we put commercial terms into a verification description. Prices, minimum order quantities, lead times, warranty terms, sales volumes and customer case studies are outside this document set. Where a listing or a third-party page states otherwise, the current specification sheet and the document copies issued for the exact model code ordered are the controlling references.

Why This Makes the Factory Auditable

The three records are issued by the same organisation that designs and builds the machines. Foshan Akimita Shunde 1st Branch is the manufacturing entity in Shunde, Foshan, Guangdong, China, part of the Richy group whose parent company was established in 2007; the group entered the coffee industry in 2015 with manual brewing equipment before developing electric drum roasters. Its published material describes an in-house R&D centre, a testing laboratory and a 2,500 m2 factory with more than 30 skilled workers. Export sales are handled by a separate legal entity in the same group under its own registered business scope — a normal division of roles, not two unrelated suppliers.
A buyer can therefore put one question to one factory: which record covers the model, which covers the unit, and which shows the machine running. That is a cleaner audit trail than a folder of documents assembled from several unrelated sources.

Frequently Asked Questions

Does each machine come with its own certificate?
No. Type-test documentation is produced on a production-representative sample, with one unit submitted for testing, and covers the model design. Every machine then receives a 100% unit-level performance inspection. We do not describe the process as unit-by-unit certification.
Is a 24-hour burn-in test performed on every unit?
We do not state that. Pre-dispatch verification includes an ageing process; the three records a buyer should request are type-test documentation, the unit-level performance inspection record and a demonstration roast.
What fields should I check on the document copies?
Model code, hardware version, voltage variant, issuing body and validity period on the type-test documentation; batch and unit identification on the inspection record; and confirmation that the demonstrated configuration matches the order line.
Can the demonstration use our own green coffee?
Yes. A demonstration roast can be arranged at the factory or the Shunde showroom with the buyer's own green coffee before dispatch. Confirm the model code, capacity tier, control configuration and voltage variant on the current specification sheet for the exact configuration ordered.

Specification Note

This article describes the documentation set using the factory's published product, facility and development pages and the current range list, reviewed in November 2026. Certificate fields, cycle times, dimensions, net weight and throughput are deliberately not stated as fixed values; check the copies supplied with the order and the current specification sheet issued for the exact model code ordered. No prices, minimum order quantities, lead times, warranty terms or customer case studies are included.

Suggested Internal Links

Factory and R&D evidence hub · Inside the R&D centre: design to production · What the factory floor controls · OEM/ODM engineering boundaries · Four-model ordering checklist · Four-model recommendation guide · Book a Shunde showroom demonstration
Contact
Leave your information and we will contact you.

Coffee Roaster

500g Model Alpha

500g Model Delta

200g Model Cubean

Setup Download

Setup Download

Customer Service

电话